National Register of Specialists (NRS) — GazEnergoConsulting
NOK — Independent Qualification Assessment NRS — NOSTROY / NOPRIZ SRO membership Certification Training and attestation Licensing Accounting outsourcing Environmental outsourcing Gazprom Gaznadzor NAKS attestation
RUEN
National Register of Specialists

Inclusion of Specialists in the NOSTROY and NOPRIZ National Registers

The National Register of Specialists (NRS) is an electronic database of qualified specialists in construction, engineering surveys and design. A register entry confirms qualification and authorizes the relevant professional activities. The registers are maintained by NOSTROY (for construction specialists) and NOPRIZ (for design and engineering-survey specialists).

For SRO membership, an organization must employ at least two specialistsincluded in the NRS. This must be their principal place of employment; secondary employment does not qualify under Clause 2, Part 6, Article 55.5 of the Urban Planning Code of the Russian Federation.

Specialist requirements
Education

Higher education in a construction-related specialty listed in Order No. 672/pr of the Ministry of Construction of Russia dated 6 November 2020. A professional retraining diploma is not a higher-education qualification.

Work experience
Qualification

The specialist must complete an Independent Qualification Assessment (NOK), obtain a qualification certificate and renew the qualification at least once every 3 years.

No criminal record

The criminal-record certificate is valid for 3 months from the date of issue. It may be obtained through the Gosuslugi portal, an MFC or a territorial body of the Ministry of Internal Affairs; the standard preparation period is 30 days.

Documents required for NRS inclusion
  1. Higher-education diploma in a construction-related specialty, notarized copy
  2. Employment record book or employment-history information, certified copy
  3. NOK qualification certificate
  4. Criminal-record certificate
  5. For foreign nationals, a work permit or patent
NRS inclusion timeline

Document review and the inclusion decision take on average up to 2 weeks. Including document collection and preparation, the full cycle is approximately 30 days. If an application is refused, the applicant is notified of the reasons and may resubmit the documents.

Document certification rules
How we can help

Describe your task — we will assess the initial conditions and propose the optimal route.

Discuss your task